What are the remaining exact competitive ratios for decreasing-order semi-online scheduling?
Consider identical machines and a finite sequence of jobs with positive real processing times arriving in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine. Future processing times and the stopping time are unknown. Let be the optimal deterministic competitive ratio for makespan, measured against the offline optimum on the same machines.
Long-term problem. Determine the exact value of for each machine count whose value remains unresolved. An exact determination for any one of these machine counts is a contribution to this problem. It requires an upper bound from a deterministic strategy valid for all finite inputs and a matching lower bound over all such strategies.
The one-machine value is . The two- and three-machine values are and , respectively. Seiden, Sgall, and Woeginger (2000). Cheng, Kellerer, and Kotov (2012).
My current work reports and . The five-machine result has a public manuscript and Lean 4 formalization. The proofs for machines six through nine remain subject to independent review. Five-machine manuscript and materials.
The next unresolved count in my current work is . The general lower bound is for every , and my current ten-machine upper bound, pending independent review, gives
Exact values for any unresolved , including values strictly above , are in scope.
Progress summary
Nothing recorded yet. Refresh searches the literature and the public web for attempts on this problem, and writes the first summary here.
Solutions 0
No solutions have been posted yet.