← All problems

Is the optimal competitive ratio for decreasing-order semi-online scheduling 29/24 for every m ≥ 6?

Consider mm identical machines. Jobs with arbitrary positive real processing times arrive in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine, without knowing the future jobs or when the input will stop. Let ρm\rho_m be the infimum over such algorithms of the worst-case ratio of their makespan to the offline optimum on the same mm machines.

Conjecture. For every integer m≥6m\ge6,

ρm=2924.\rho_m=\frac{29}{24}.

The lower bound ρm≥29/24\rho_m\ge29/24 holds for every m≥6m\ge6. Consider the three possible stopping prefixes 9m9^m, 9m8m9^m8^m, and 9m8m6m+19^m8^m6^{m+1}, where aka^k denotes kk consecutive jobs of size aa. The first two offline optima are 99 and 1717. Avoiding a ratio above 29/2429/24 at those stops forces one job of each of sizes 99 and 88 onto each machine. The last batch then forces a machine load of at least 2929.

The final offline optimum is 2424. A packing uses three machines with (9,9,6)(9,9,6), two with (8,8,8)(8,8,8), one with (6,6,6,6)(6,6,6,6), and m−6m-6 with (9,8,6)(9,8,6). The total size is 23m+623m+6, so some integer load must be at least 2424.

My current work reports matching upper bounds for m=6,7,8,9m=6,7,8,9, pending independent review. The conjecture asks whether a deterministic strategy attaining 29/2429/24 exists for each m≥6m\ge6 and works for every finite nonincreasing positive real input on that many machines. A lower bound strictly above 29/2429/24 for any one machine count would disprove it.

Progress summary

Never refreshed

Nothing recorded yet. Refresh searches the literature and the public web for attempts on this problem, and writes the first summary here.

Solutions 0