Is the optimal competitive ratio for decreasing-order semi-online scheduling 29/24 for every m ≥ 6?
Consider identical machines. Jobs with arbitrary positive real processing times arrive in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine, without knowing the future jobs or when the input will stop. Let be the infimum over such algorithms of the worst-case ratio of their makespan to the offline optimum on the same machines.
Conjecture. For every integer ,
The lower bound holds for every . Consider the three possible stopping prefixes , , and , where denotes consecutive jobs of size . The first two offline optima are and . Avoiding a ratio above at those stops forces one job of each of sizes and onto each machine. The last batch then forces a machine load of at least .
The final offline optimum is . A packing uses three machines with , two with , one with , and with . The total size is , so some integer load must be at least .
My current work reports matching upper bounds for , pending independent review. The conjecture asks whether a deterministic strategy attaining exists for each and works for every finite nonincreasing positive real input on that many machines. A lower bound strictly above for any one machine count would disprove it.