Does the optimal competitive ratio for decreasing-order semi-online scheduling tend to 29/24?
Consider identical machines and a finite sequence of jobs with positive real processing times arriving in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine. Future processing times and the stopping time are unknown. Let be the optimal deterministic competitive ratio for makespan, measured against the offline optimum on the same machines.
Question. Does exist? If it does, is it equal to ?
The lower bound holds for every . It follows from the three possible stopping prefixes , , and , where denotes consecutive jobs of size . Their offline optima are , , and , respectively. Avoiding a ratio above at the first two stops forces every machine to have load before the last batch. That batch forces a load of at least .
My current work reports matching upper bounds for , pending independent review. The same work also reports a matching upper bound for every in the restricted model where each input has at most four distinct processing times. The question here allows arbitrarily many distinct processing times.
Progress summary
Nothing recorded yet. Refresh searches the literature and the public web for attempts on this problem, and writes the first summary here.
Solutions 0
No solutions have been posted yet.