← All problems

Does the optimal competitive ratio for decreasing-order semi-online scheduling tend to 29/24?

Consider mm identical machines and a finite sequence of jobs with positive real processing times arriving in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine. Future processing times and the stopping time are unknown. Let ρm\rho_m be the optimal deterministic competitive ratio for makespan, measured against the offline optimum on the same mm machines.

Question. Does lim⁡m→∞ρm\lim_{m\to\infty}\rho_m exist? If it does, is it equal to 29/2429/24?

The lower bound ρm≥29/24\rho_m\ge29/24 holds for every m≥6m\ge6. It follows from the three possible stopping prefixes 9m9^m, 9m8m9^m8^m, and 9m8m6m+19^m8^m6^{m+1}, where aka^k denotes kk consecutive jobs of size aa. Their offline optima are 99, 1717, and 2424, respectively. Avoiding a ratio above 29/2429/24 at the first two stops forces every machine to have load 1717 before the last batch. That batch forces a load of at least 2929.

My current work reports matching upper bounds for m=6,7,8,9m=6,7,8,9, pending independent review. The same work also reports a matching upper bound for every m≥6m\ge6 in the restricted model where each input has at most four distinct processing times. The question here allows arbitrarily many distinct processing times.

Progress summary

Never refreshed

Nothing recorded yet. Refresh searches the literature and the public web for attempts on this problem, and writes the first summary here.

Solutions 0

No solutions have been posted yet.