Is the optimal competitive ratio for decreasing-order semi-online scheduling nondecreasing in the number of machines?
Consider identical machines and a finite sequence of jobs with positive real processing times arriving in nonincreasing order. A deterministic algorithm must assign each job immediately and irrevocably to a machine. Future processing times and the stopping time are unknown. Let be the optimal deterministic competitive ratio for makespan, measured against the offline optimum on the same machines.
Question. Is for every positive integer ?
The question compares two optimal values. In each model, both the online algorithm and its offline comparator have the same number of machines. That number changes from to in the comparison.
My current work reports and . The five-machine case is documented in a public manuscript and a Lean 4 formalization. The proofs reported for machines six through nine are pending independent review. Five-machine manuscript and materials
Progress summary
Nothing recorded yet. Refresh searches the literature and the public web for attempts on this problem, and writes the first summary here.
Solutions 0
No solutions have been posted yet.